Control valve instrumentation engineering


Contact and division of labor with other installation works. Described below.
1 meter time to take the source component installation, completion of the construction unit should be installed by the process and pipeline. Process piping manufactured or prefabricated, installed at the same time to complete the installation. For example, take the openings of the source component and welding should be completed before the process piping or equipment corrosion lining, purge, pressure testing; high-pressure steel, alloy steel, non-ferrous metal pipe to take the source components should be used machining methods; furnace installation and other masonry or concrete pouring on to take the source components should be buried in the masonry or cast. Take the source valve should be installed after passing inspection, and should not be used sleeve type connection.
2 installed directly in the process piping instrumentation, such as orifice, rotameter, control valves, pipeline installation and construction units should be in the purge of the process piping and pressure test before installation. If you need to process piping installed at the same time, you should purge process piping, pipeline installation and construction units will remove the instrument, and install short tube, after the completion of the purge these instruments installed by the pipeline installation and construction units.
Control valve the measurement orifice Automation Instrumentation required for installation support, base or boom should be pipeline installation and construction units to complete the installation o. Maintenance of instrumentation and automation equipment required operating platform, connecting channels and other components from the installation and construction equipment and piping installation and construction units.
Instruments, automation equipment and pipe insulation works by insulation installation construction unit.steam solenoid valves
Instrumentation, automation equipment, insulation, heating and discharge lines Explorer works, instrument with compressed air, hydraulic lines Explorer installation and construction works by pipeline installation and construction units.pneumatic hand valve
6. Instrumentation, automation equipment and auxiliary equipment connecting pipelines, insulation, heating and discharge line of the branch pipe installed by instrumentation engineering construction unit installation facilities.
Special instrument installed by specialized units installed installation and construction. For example, the analytical instruments, the introduction of special instruments with ancillary equipment installed by the manufacturer assigned professional installation unit installation and construction.
If not specified in the design of instrumentation and automation equipment installation, construction unit with the general contractor should be determined in consultation construction unit and division of labor.high temperature solenoid valve