① discharge valve should be neatly stored in dry and ventilated warehouse, non-stacked or open storage, valve size at both ends to be clogged with blind plate.
pneumatic hand valve
(2) installed prior to double-check valves, and clear the valve carriage within the damage caused during storage.
③ Note that the ministries of the screws should be installed in the force balance, movements are flexible.
(4) discharge valve should be installed where severe vibration and shock, as well as with valve damage venues.
(5) the material when blocked, you can use a metal rod or rigid tools dredge, to pay attention to the use of metal rod or rigid tool not to damage the valve and seal contact surface.
(7) based on media performance and the use of, you should always check the top of the discharge valve body, PTFE seals and the plate, the PTFE sheet. If there are damaged should be replaced promptly re-use.
⑥ discharge valve should try to avoid the pH medium used interchangeably (except in the reaction medium), so as not to shorten the life span.
没有评论:
发表评论